Exclusively for Australian Homeowners & Independent Inspectors · Builders Prohibited

Your home. Your rights. Know the standards.

Defend My Build equips Australian homeowners and independent building inspectors to understand technical building standards, document defects, and take decisive action against substandard building work.

Consumer & Inspector Excluded TerritoryZERO BUILDER ACCESS

Defend My Build is strictly reserved for consumers and independent inspectors. Building companies, volume builder representatives, and industry lobby associations (HIA/MBA) are strictly prohibited.

Tools

Everything you need to defend your build

From first defects notice to final resolution — free and open to all Australians.

21
Free standards in our library
33
Legal templates ready to use
6 yrs
Structural warranty under WA law
14 days
Builder must respond to defects notice

The Rules That Bind Them

Key standards that protect you

These are the government and industry standards that define what a builder must deliver. Not opinions — binding obligations.

WA Residential

WA Guide to Standards & Tolerances 2019

DEMIRS — WA Government

  • →Clause 2.11: Slab finish is defective if not suitable for documented applied finishes (inc. decorative/polished concrete)
  • →Clause 2.08: Floor defective if >4mm in any 2m length within 24 months
  • →Clause 2.12: Repairs must match existing work — if not possible, entire surface replaced
Polished Concrete

PCCA Position Statements

Polished Concrete Council of Australia

  • →Slab protection is the builder's responsibility — not the polisher's
  • →Polishing contractor cannot fix concretor defects without grinding deeper (changes the finish)
  • →Boothole marks, screed marks, rough edges at internal corners cannot be rectified by polishing
Technical Spec

Diagrind DPC2021 Specification

Industry specification — ACI 300-R, AS 3610.1

  • →Minimum S32 (32 MPa) to AS1379 — mandatory
  • →Max 3mm deviation under 3m straight edge
  • →Max 1mm undulation over 300mm
  • →Hydrocarbon resin curing agent not permitted
Australian Standard

AS 2870-2011

Australian Standard — Referenced in NCC 2022

  • →Residential slabs and footings
  • →Defines crack damage categories 0–4
  • →Category 3 & 4 cracks are defective and require rectification
  • →Deviation >1:150 overall is undesirable
Australian Standard

AS 3600-2018

Australian Standard — Referenced in NCC 2022

  • →Concrete structures
  • →Floor tolerance requirements
  • →32 MPa minimum for pneumatic-tyred traffic / polished floor surfaces
  • →Abrasion resistance requirements by use
Industry Technical

CCAA — Finishing Concrete Flatwork

Cement Concrete & Aggregates Australia

  • →Smooth surface finish is NOT evidence of good compaction underneath
  • →Dry-shake toppings must not be used to mask defective concrete
  • →Incorrect finishing causes crazing and delamination

How It Works

From defect to resolution

From identifying your defect to submitting evidence to DEMIRS or the Building Commission.

01

Identify your defect

Use our standards library to understand what the builder was required to deliver — and what they failed to do.

02

Build your evidence

Templates for evidence submissions to DEMIRS, the Building Commission, and your legal representative. Based on real standards.

03

Take action

Know which authority to contact, what to say, and what supporting documents to attach. We map the complaint pathway for WA residential builds.

Why This Exists

Built by someone who lived it

Defend My Build was created by a Perth homeowner who spent four years fighting a national building company over defective work — including a polished concrete slab poured with the wrong product, inadequate reinforcement cover, and backdated engineering documents.

The process is designed to exhaust you financially and emotionally. Builders have institutional legal resources. Homeowners have a contract they can barely read. This platform exists to level that playing field — with the actual standards, the actual tolerances, and the actual complaint pathways that apply.

This is not legal advice. It is industry knowledge — the same references that expert witnesses, building consultants, and quantity surveyors use — made accessible to the people who need it most.

Industry bodies & standards referenced

Polished Concrete Council of Australia (PCCA)Cement Concrete & Aggregates Australia (CCAA)DEMIRS — Building and Energy DivisionWA Building CommissionAS 2870 · AS 3600 · AS 1379ACI 300-R · ACI 310R-13NCC 2022 Volume One

Get In Touch

Ready to defend your build?

Have a building dispute question, or want to contribute a case study or industry document to the standards library? Reach out — or jump straight in.

info@axdintelligence.com.auPerth, Western Australia
Defend My Build

© 2026 Defend My Build · Not legal advice.

Designed by Diego Nanini · © 2026 Diego Nanini · AXD Intelligence